Notice of Public Meeting Concerning FM 6

        

Notice of Public Meeting
FARM-TO-MARKET (FM) 6
From State Highway (SH) 78 to Hunt County Line
CSJ: 0619-01-027
COLLIN County, Texas

The Texas Department of Transportation (TxDOT) is proposing to improve Farm-to-Market (FM) 6 from State Highway (SH) 78 to the Hunt County line, a total of approximately 7.88 miles, in Collin County, Texas. This notice advises the public that TxDOT will be conducting an in-person and online virtual public meeting on the proposed project. The virtual meeting will consist of a pre-recorded video presentation and will include both audio and visual components. The materials can be viewed at your convenience. To log onto the virtual public meeting, go to the project website any time during the dates and times indicated below. If you do not have internet access, you may call (214) 320-6244 between the hours of 8 a.m. and 5 p.m., Monday through Friday, to ask questions and access project materials during the project development process. Additionally, TxDOT is providing an in-person option for individuals who would like to participate in person. In-person attendees will be able to view the same presentation delivered in the online public meeting which will be playing on a screen, review project materials, ask questions of TxDOT staff and/or consultants, and leave written comments.

 

In-Person Meeting

 

 

Virtual Meeting*

 

Thursday, October 20, 2022

5:30 p.m. to 7:30 p.m.

 

 

Thursday, October 20, 2022, at 5:30 p.m. through Friday, November 4, 2022, at 11:59 p.m.

 

 

Community High School Cafeteria

440 N FM 1138, Nevada, TX 75173

 

www.keepitmovingdallas.com/FM6

*Not a live event

 

 

 

The proposed project involves the reconstruction of the existing two-lane rural roadway to a four (ultimate six) lane divided highway. A continuous 10-foot shared use path would be constructed on the east and west sides of the proposed roadway alignment. The proposed project consists generally of four (ultimate six) lanes with curb and gutter, plus a raised median. The roadway passes through the cities of Nevada and Josephine. The existing FM 6 right-of-way (ROW) width ranges from 60-feet to 100-feet wide throughout the length of the project. The proposed ROW width is 140 feet.

The proposed project would, subject to final design consideration, require approximately 45 acres of additional ROW and potentially displace structures on commercial and/or residential properties. Relocation assistance is available for displaced persons and businesses. Information about the TxDOT Relocation Assistance Program and services and benefits for those displaced and other affected property owners, as well as information about the tentative schedule for ROW acquisition and construction, can be obtained from the TxDOT Dallas District office by calling (214) 320-6675 or online at the project website.   

Any environmental documentation or studies, any maps and drawings showing the project location and design, tentative construction schedules, and other information regarding the proposed project are on file and available for inspection Monday through Friday between the hours of 8 a.m. and 5 p.m. at the TxDOT Dallas District office at 4777 East Highway 80 Mesquite, Texas 75150. Project materials will also be available online at www.keepitmovingdallas.com/FM6 or in hard copy form for review at the in-person meeting.

The public meeting will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the public meeting, please contact  the Dallas District Public Information Office at (214) 320-4480 no later than 4 p.m., Wednesday, October 12, 2022. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange.

Comments from the public regarding the proposed project are requested and may be submitted by mail to the TxDOT Dallas District Office, Attn: Kibru Andargie, P.E., 4777 East Highway 80 Mesquite, Texas 75150 or by email to Kibru.Andargie@txdot.gov. Verbal comments may be submitted by leaving a voicemail by calling (833) 933-0437. All comments must be received on or before Friday, November 4, 2022. Responses to comments received will be available online at the website shown above once they have been prepared.

If you have any general questions or concerns regarding the proposed project or the meeting, please contact the TxDOT project manager, Kibru Andargie, P.E., by phone at (214) 320-6244, or by email at  Kibru.Andargie@TxDOT.gov.

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 9, 2019, and executed by FHWA and TxDOT.